0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Мост краљевића Андреја (Most kraljevića Andreja); Мост цара Франца Јозефа (Most cara Franca Jozefa)
Other name(s): Emperor Franz Joseph Bridge
Beginning of works: 9 September 1881
Completion: 11 November 1883
Status: destroyed (11 April 1941)

Project Type

Location

Location: , ,
Crossed:
  • Danube
Will be replaced by: Novi Sad Bridge
Coordinates: 45° 15' 2.79" N    19° 51' 31.25" E
Show coordinates on a map

Technical Information

Dimensions

total length 432 m
span lengths 76.0 m - 2 x 92.0 m - 96.0 m - 76.0 m
number of spans 5
number of tracks 1
track gauge 1 435 mm
piers number 4

Materials

piers reinforced concrete
truss steel

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20058444
  • Published on:
    02/10/2010
  • Last updated on:
    27/02/2025
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine