General Information
Project Type
Structure: |
Deck arch bridge original configuration: Pointed arch bridge |
---|---|
Function / usage: |
Pedestrian bridge (footbridge) |
Material: |
Weathering steel bridge original configuration: Masonry bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Sant Celoni, Barcelona, Catalonia, Spain |
---|---|
Crosses: |
|
Coordinates: | 41° 40' 47.09" N 2° 29' 13.50" E |
Technical Information
Dimensions
total length | 72 m | |
span lengths | 20 m - 24 m | |
number of spans | 2 |
Quantities
structural steel | 80 t |
Cost
cost of construction | Euro 1 200 000 |
Materials
superstructure |
weathering steel
|
---|---|
arch |
weathering steel
|
Notes
Restoration project for an old masonry bridge destroyed in the Napoleonic Wars. The broken arch span was replaced with an arch made of weathering steel.
Participants
Relevant Web Sites
Relevant Publications
- Footbridge Awards 2005. In: Bridge Design & Engineering, v. 11, n. 41 (4th Quarter 2005), pp. 35-49. (2005):
- (2005): Restauration of the pont Trencat (Broken bridge). Presented at: Footbridge 2005 (Second International Congress), Venezia, 06-08 December 2005.
- Restoration of the Pont Trencat (broken bridge). Barcelona, Spain. Presented at: Steelbridge 2004, Millau, 23-25 June 2004, pp. 119-120. (2004):
- About this
data sheet - Structure-ID
20012336 - Published on:
29/06/2004 - Last updated on:
05/06/2019