General Information
Project Type
| Structure: |
Deck arch bridge original configuration: Pointed arch bridge |
|---|---|
| Function / usage: |
Pedestrian bridge (footbridge) |
| Material: |
Weathering steel bridge original configuration: Masonry bridge |
| Plan view: |
Structurae Plus/Pro - Subscribe Now! |
| Deck levels: |
Structurae Plus/Pro - Subscribe Now! |
Location
| Location: |
Sant Celoni, Barcelona, Catalonia, Spain |
|---|---|
| Crosses: |
|
| Coordinates: | 41° 40' 47.09" N 2° 29' 13.50" E |
Technical Information
Dimensions
| total length | 72 m | |
| span lengths | 20 m - 24 m | |
| number of spans | 2 |
Quantities
| structural steel | 80 t |
Cost
| cost of construction | Euro 1 200 000 |
Materials
| superstructure |
weathering steel
|
|---|---|
| arch |
weathering steel
|
Notes
Restoration project for an old masonry bridge destroyed in the Napoleonic Wars. The broken arch span was replaced with an arch made of weathering steel.
Participants
Relevant Web Sites
Relevant Publications
- (2005): Footbridge Awards 2005. In: Bridge Design & Engineering, v. 11, n. 41 (4th Quarter 2005), pp. 35-49.
- (2005): Restauration of the pont Trencat (Broken bridge). Presented at: Footbridge 2005 (Second International Congress), Venezia, 06-08 December 2005.
- (2004): Restoration of the Pont Trencat (broken bridge). Barcelona, Spain. Presented at: Steelbridge 2004, Millau, 23-25 June 2004, pp. 119-120.
- About this
data sheet - Structure-ID
20012336 - Published on:
29/06/2004 - Last updated on:
05/06/2019


