0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): New Paseo Bridge
Beginning of works: August 2008
Completion: 27 September 2010
Status: in use

Project Type

Awards and Distinctions

2012 Merit Award  

Location

Location: , , ,
, , ,
Crosses:
  • Missouri River
Replaces: Paseo Bridge (1954)
Coordinates: 39° 7' 21.96" N    94° 33' 55.86" W
Show coordinates on a map

Technical Information

Dimensions

main span 168 m
width 41.80 m
total length 523 m
span lengths 46 m - 168 m - 138 m - 36 m - 2 x 54 m - 28 m
number of lanes 7
abutments number 2
deck deck slab thickness 0.225 m
piers number 5
pylon height 96.00 m
number 1

Cost

cost of construction United States dollar 232 000 000

Materials

pylon reinforced concrete
piers reinforced concrete
deck slab high performance concrete
main girders steel

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20049466
  • Published on:
    06/12/2009
  • Last updated on:
    20/06/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine