General Information
| Other name(s): | Boyne River Bridge |
|---|---|
| Beginning of works: | May 2000 |
| Completion: | 9 June 2003 |
| Status: | in use |
Project Type
| Structure: |
Cable-stayed bridge with semi-fan system |
|---|---|
| Function / usage: |
Motorway bridge / freeway bridge |
| Structure: |
Two-span cable-stayed bridge |
| Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
| Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Location
| Location: |
Drogheda, County Louth, Ireland |
|---|---|
| Crosses: |
|
| Coordinates: | 53° 43' 5.57" N 6° 23' 48.82" W |
Technical Information
Dimensions
| main span | 170 m | |
| total length | 352.5 m | |
| deck | deck width | 34.5 m |
| pylon | pylon height | 95 m |
Materials
| pylon |
reinforced concrete
|
|---|
Participants
Design
Structural engineering
Contractor
Co-contractor
- Cleveland Bridge & Engineering Co. Ltd.
- SIAC Construction Ltd (substructure)
Stay cables
Formwork
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- 56 haubans pour franchir la Boyne. In: Freyssinet Magazine, n. 216 (January - April 2003), pp. 15.
- Freyssinet cable-stayed structures. Freyssinet International, Vélizy-Villacoublay (France), 2004, pp. 63.
- About this
data sheet - Structure-ID
20004537 - Published on:
16/08/2002 - Last updated on:
30/11/2017


