General Information
| Other name(s): | Tank Street Bridge |
|---|---|
| Beginning of works: | 2007 |
| Completion: | 4 October 2009 |
| Status: | in use |
Project Type
| Function / usage: |
Bicycle and pedestrian bridge |
|---|---|
| Structure: |
Tensegrity bridge |
| Material: |
Steel bridge Structurae Plus/Pro - Subscribe Now! |
Location
| Location: |
Brisbane, Queensland, Australia |
|---|---|
| Crosses: |
|
| Coordinates: | 27° 28' 9.84" S 153° 1' 4.80" E |
Technical Information
Dimensions
| main span | 135 m | |
| total length | 425 m | |
| deck | width | 11.0 m |
| length | 235 m | |
| mast | height | 30.0 m |
| pylon | height | 8.0 m |
Materials
| cables |
steel
|
|---|---|
| deck |
steel
precast reinforced concrete |
| pylons |
reinforced concrete
|
| masts |
steel
|
Chronology
| 4 October 2009 | Completion. |
|---|
Participants
Design
Checking engineering
Contractor
Relevant Web Sites
Relevant Publications
- (2008): Cradle concept. In: Bridge Design & Engineering, v. 14, n. 52 (3rd Quarter 2008), pp. 36-37.
- (2011): Kurilpa Bridge – a Case Study. Presented at: 4th International Conference Footbridge 2011, Wroclaw, Poland, 6-8 July 2011.
- Tense moments. In: Bridge Update, n. 81 (January 2009), pp. 2.
- About this
data sheet - Structure-ID
20043327 - Published on:
02/02/2009 - Last updated on:
05/02/2016


