General Information
| Completion: | 16 February 2024 |
|---|---|
| Duration of works: | 18 months |
| Status: | in use |
Project Type
| Structure: |
Covered bridge Truss bridge |
|---|---|
| Function / usage: |
Elevator |
| Material: |
Steel bridge |
| Plan view: |
Structurae Plus/Pro - Subscribe Now! |
| Deck levels: |
Structurae Plus/Pro - Subscribe Now! |
Location
| Location: |
Vigo, Pontevedra, Galicia, Spain |
|---|---|
| Coordinates: | 42° 14' 7.64" N 8° 42' 43.88" W |
Technical Information
Dimensions
| main span | 84 m | |
| diameter | 84 m | |
| span lengths | 80 m - 84 m | |
| walkway width | 4.5 m | |
| tower | height | 40 m |
| truss 1 | height | 5.9 m |
| truss 2 | height | 4.8 m |
Materials
| tower |
steel
|
|---|---|
| truss |
steel
|
Participants
Architecture
Structural design
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2025): Halo: a New Circular Footbridge and Elevator Connection in Vigo, Spain. Presented at: Footbridge Chur 2025: in situ, Chur, Switzerland, 3-5 September 2025.
- (2025): HALO: a new circular footbridge and elevator connection in Vigo, Spain. Presented at: IABSE Congress: The Essence of Structural Engineering for Society, Ghent, Belgium, 27-29 August 2025, pp. 2433-2439.
- About this
data sheet - Structure-ID
20091999 - Published on:
08/10/2025 - Last updated on:
08/10/2025


