0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1922
Completion: 1. July 1926
Status: in use

Project Type

Awards and Distinctions

Location

Location: , , ,
, , ,
Crosses:
  • Delaware River
Part of:
Coordinates: 39° 57' 18.64" N    75° 8' 50.89" W
Coordinates: 39° 56' 57.67" N    75° 7' 11.55" W
Show coordinates on a map

Technical Information

Dimensions

main span 533.75 m
total length 972.6 m
span lengths 218.4 m - 533.75 m - 218.4 m
clearance 41.1 m
number of spans 3
number of lanes 7

Materials

cables steel
deck steel
pylons steel

Chronology

6. January 1922

Construction begins.

1. July 1926

Opened to traffic.

Participants

Design
Architecture
Consulting engineers
Construction
Cables

Relevant Web Sites

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    20000531
  • Published on:
    20/11/1999
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine