0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Puente Baluarte Bicentenario
Beginning of works: 21 February 2008
Completion: 5 January 2012
Duration of works: 30 months
Status: in use

Project Type

Location

Location: ,
,
Coordinates: 23° 32' 5.26" N    105° 45' 36.98" W
Show coordinates on a map

Technical Information

Dimensions

main span 520 m
width 20 m
total length 1 124 m
pylons number 2

Cost

cost of construction Mexican peso 2 450 000 000

Materials

piers reinforced concrete
deck of main span steel
pylons reinforced concrete
deck of approach viaducts concrete
abutments reinforced concrete

Participants

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20033125
  • Published on:
    06/11/2007
  • Last updated on:
    14/12/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine