0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Blagoveshchensk–Heihe Bridge

General Information

Other name(s): Heilongjiang River Bridge; Amur River Bridge
Beginning of works: December 2016
Completion: 10 June 2022
Status: in use

Project Type

Location

Location: , ,
, , ,
Crosses:
  • Amur
Coordinates: 50° 12' 4.81" N    127° 35' 58.34" E
Show coordinates on a map

Technical Information

Dimensions

width 14.5 m
total length 1 284 m
main spans 147 m
number of spans 12
number of lanes 2

Materials

piers reinforced concrete
pylons steel
main girders steel

Excerpt from Wikipedia

The Blagoveshchensk-Heihe Bridge (Russian: мост Благовещенск — Хэйхэ; Chinese: 黑河-布拉戈维申斯克界河公路大桥) is a bridge across the Amur River, connecting the cities of Blagoveshchensk, Russia, and Heihe, China. According to CNN, the construction of the bridge started in 2016 and was completed in late 2019. It was estimated that the bridge cost 18.8 billion rubles.

Regular bridge traffic started on June 10, 2022. The new crossing between China and Russia is currently available only for freight traffic.

Text imported from Wikipedia article "Blagoveshchensk–Heihe Bridge" and modified on 12 June 2023 according to the CC-BY-SA 3.0 license.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20016123
  • Published on:
    21/04/2005
  • Last updated on:
    18/05/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine