0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Tunnelling-Induced Settlement and Treatment Techniques for a Loess Metro in Xi’an

Autor(en):






Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Advances in Civil Engineering, , v. 2020
Seite(n): 1-20
DOI: 10.1155/2020/1854813
Abstrakt:

Techniques including pre-grouting, long pipe roof, and parameter optimization were employed to ensure the safety of loess metro tunnelling under an existing glass building. Their effects were proved through monitoring the settlement of building and surface during tunnelling. Besides, division of settlement monitoring according to processes, a new method, was conducted to control settlement in time. The highest surface settlement after construction was 16 mm only, meeting the requirement. The result indicates that it is practicable to control the tunnelling settlement strictly in extremely difficult geological areas. The settlement regularities were also studied through numerical simulation; their deformation is larger compared with in situ results while their change trends coincide during most processes. Soil excavations cause settlement primarily, accounting for more than 60%. It is suggested that dual slurry pre-grouting and process-based measurement should be employed before each excavation in water-rich loess areas.

Copyright: © Heng Li et al.
Lizenz:

Dieses Werk wurde unter der Creative-Commons-Lizenz Namensnennung 4.0 International (CC-BY 4.0) veröffentlicht und darf unter den Lizenzbedinungen vervielfältigt, verbreitet, öffentlich zugänglich gemacht, sowie abgewandelt und bearbeitet werden. Dabei muss der Urheber bzw. Rechteinhaber genannt und die Lizenzbedingungen eingehalten werden.

  • Über diese
    Datenseite
  • Reference-ID
    10474976
  • Veröffentlicht am:
    13.11.2020
  • Geändert am:
    02.06.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine