General Information
Other name(s): | Golden Horn Bay Bridge |
---|---|
Beginning of works: | 25 July 2008 |
Completion: | 11 August 2012 |
Status: | in use |
Project Type
Structure: |
Cable-stayed bridge with semi-fan system |
---|---|
Function / usage: |
Road bridge |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Vladivostok, Primorsky Krai, Far Eastern Federal District, Russia |
---|---|
Coordinates: | 43° 6' 5.96" N 131° 53' 46.24" E |
Coordinates: | 43° 6' 59.34" N 131° 53' 53" E |
Technical Information
Dimensions
main span | 737 m | |
width | 28.5 m | |
total length | 1 388 m | |
pylons | height | 226.25 m |
Cost
cost of construction | ca. Ruble 21 000 000 000 |
Participants
Subcontractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2013): Engineering solutions for Golden Horn Bay Bridge with V-shaped pylons. Presented at: IABSE Symposium: Long Span Bridges and Roofs - Development, Design and Implementation, Kolkata, India, 24-27 September 2013, pp. 1-5.
- Longer…. Presented at: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011. (2011):
- About this
data sheet - Structure-ID
20061971 - Published on:
06/10/2011 - Last updated on:
14/11/2018