Zhengzhou Yellow River Bridge

General Information

Beginning of works: June 2007
Completion: October 2010
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Yellow River
Coordinates: 34° 55' 8.26" N    113° 44' 58.12" E

Technical Information

Dimensions

total length 9.17 km
main bridge
total length 1 684.35 m
1st section span lengths 120 m - 5 x 168 m - 120 m
2nd section span lengths 5 x 120 m

Quantities

structural steel 26 970 t
concrete volume 14 109 m³
stay cables steel for cable-stays 214.45 t

Design Loads

railroad bridge  design speed 350 km/h
live load 2 x 0.8 UIC
road bridge design speed 100 km/h

Materials

deck truss steel
deck slab concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20049468
  • Date created
    06/12/2009
  • Last Update
    05/02/2016