General Information
Name in local language: | 杨浦大桥 (Yángpǔ Dàqiáo) |
---|---|
Completion: | October 1993 |
Status: | in use |
Project Type
Structure: |
Cable-stayed bridge with semi-fan system |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Steel-reinforced concrete composite bridge |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
total length | 8 354 m | |
number of lanes | 6 | |
deck | deck width | 30.35 m |
main bridge | ||
---|---|---|
main span | 602 m | |
span lengths | 99 m - 144 m - 602 m - 144 m - 99 m | |
number of spans | 5 | |
pylon | pylon height | 223 m |
Materials
deck |
composite steel-reinforced concrete
|
---|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Bridge Engineering Handbook. CRC Press, Boca Raton (USA), pp. 63-30 - 63-31. (1999):
- Bridging the World. Bridge Ink, Wilsonville (USA). (2003):
- (2009): Cable-Stayed Bridges in Shanghai where Chinese Recent Major Bridges Launched. Presented at: IABSE Workshop: Recent Major Bridges, Shanghai, China, 11-12 May 2009, pp. 201-211.
- (2009): China's Major Bridges. Presented at: IABSE Workshop: Recent Major Bridges, Shanghai, China, 11-12 May 2009, pp. 1-24.
- Fatigue life estimation of steel girder of Yangpu cable-stayed Bridge due to buffeting. In: Journal of Wind Engineering and Industrial Aerodynamics, v. 80, n. 3 (April 1999), pp. 383-400. (1999):
- About this
data sheet - Structure-ID
20000982 - Published on:
27/09/2000 - Last updated on:
26/01/2017