General Information
Project Type
Structure: |
Cable-stayed bridge with semi-fan system |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Prestressed concrete bridge |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Wuhan, Hubei, China |
---|---|
Crosses: |
|
Coordinates: | 30° 36' 18.48" N 114° 19' 12.52" E |
Technical Information
Dimensions
total length | 4 687.73 m | |
number of cables | 392 | |
span lengths of main bridge | 5 m - 180 m - 400 m - 180 m - 5 m | |
deck | deck depth | 3.0 m |
main bridge | ||
---|---|---|
length | 1 877 m |
Materials
deck |
prestressed concrete
|
---|
Participants
Design
Structural engineering
Construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Bridge Engineering Handbook. CRC Press, Boca Raton (USA), pp. 63-31. (1999):
- About this
data sheet - Structure-ID
20001882 - Published on:
30/08/2001 - Last updated on:
05/02/2016