• de
  • en
  • fr
  • International Database for Civil and Structural Engineering
Advertising

West Link Bridge

General Information

Completion: 2003
Status: in use

Project Type

Structure: Box girder bridge
Function / usage: Road bridge
Construction method: Balanced cantilever method
Material: Prestressed concrete bridge

Location

Location: ,
Address: M 50
Crosses:
  • Liffey
Next to: West Link Bridge (1990)
Coordinates: 53° 21' 44.79" N    6° 22' 58.34" W

Technical Information

Dimensions

total length 385 m

Materials

deck prestressed concrete

Chronology

21 September 2003

Opening.

Participants

Consulting engineers

Relevant Web Sites

Relevant Publications

  • Pearce, Martin & Jobson, Richard Bridge Builders, Wiley, ISBN 047149786X, 2002
  • About this
    data sheet
  • Structure-ID
    20003940
  • Date created
    24/06/2002
  • Last Update
    05/02/2016