• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Waibaidu Bridge

Waibaidu Bridge

General Information

Beginning of works: 1906
End of works: 1907

Project Type

Structure: Through truss bridge
Function / usage: Road bridge
Material: Steel bridge

Geographic Information & Related Structures

Location: Shanghai, China
Crosses:
  • Suzhou Creek
Replaces: Garden Bridge (1873)

Technical Information

Materials

truss steel

Participants

Steel construction

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

There is no relevant literature listed in the database.

  • About this
    data sheet
  • Structure-ID
    20007627
  • Date created
    09/01/2003
  • Last Update
    29/07/2014