0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Brightman Street Bridge
Beginning of works: 17 May 2007
Completion: 11 October 2011
Status: in use

Project Type

Structure: Double-leaf bascule bridge
Function / usage: Road bridge

Location

Location: , , ,
, , ,
Address: U.S. Route 36 / State Route 138
Crosses:
  • Taunton River
To replace: Brightman Street Bridge (1908)
Coordinates: 41° 43' 35.61" N    71° 9' 5.73" W
Show coordinates on a map

Technical Information

Cost

cost of construction United States dollar 230 000 000

Participants

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20038723
  • Published on:
    05/08/2008
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine