General Information
Project Type
Function / usage: |
Pedestrian bridge (footbridge) |
---|---|
Structure: |
Cable-stayed bridge with curved deck Underspanned cable-stayed bridge Inverted Fink truss bridge |
Location
Location: |
Paris-La Défense, Hauts-de-Seine (92), Ile-de-France, France Nanterre, Hauts-de-Seine (92), Ile-de-France, France |
---|---|
Connects to: |
Granite Tower (2008)
|
Coordinates: | 48° 53' 30.23" N 2° 13' 48.22" E |
Technical Information
Dimensions
width | 4.50 m | |
length | ca. 90 m |
Cost
cost of construction | Euro 2 800 000 |
Notes
The design calls for a curved cable-stayed bridge with suspension on one side only.
Participants
Initial construction (2006-2008)
Owner
Architecture
-
Dietmar Feichtinger Architectes
- Dietmar Feichtinger (architect)
Structural engineering
-
schlaich bergermann partner
- Michael Zimmermann (structural engineer)
Steel construction
Subcontractor
Foundations
Cable installation
Relevant Web Sites
Relevant Publications
- Bridge Architecture + Design. 1st edition, Braun Publishing AG, Salenstein (Switzerland), ISBN 978-3-03768-025-4, pp. 80-83. (2010):
- La Défense. Une passerelle bien vertébrée. In: Chantiers de France, n. 404 (October 2007), pp. 24-25. (2007):
- Feichtinger Architectes. Passerelle Granite, La Défense (92). In: Architecture Acier Construction, n. 7 (April 2008), pp. 32-35. (2008):
- French connection. In: Bridge Update, n. 77 (July 2008), pp. 2.
- Mehr als die Verbindung zweier Ufer. In: Brückenbau, v. 1, n. 2 ( 2009), pp. 17. (2009):
- About this
data sheet - Structure-ID
20015244 - Published on:
23/02/2005 - Last updated on:
05/02/2016