• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Tunnel Nord-Süd-Fernbahn

No images are currently available for this data page. If you would like to help us illustrate this page, do not hesitate to send us your images!

General Information

Other name(s): Spreebogentunnel
Beginning of works: 1995
Completion: 28 May 2006
Status: in use

Project Type

Structure: Tunnel
Function / usage: Railroad (railway) tunnel
Construction method: Immersed tube method
Cut-and-cover method
Tunnel shield


Location: Berlin-Kreuzberg, Friedrichshain-Kreuzberg, Berlin, Germany
Berlin-Moabit, Mitte, Berlin, Germany
Berlin-Tiergarten, Mitte, Berlin, Germany
Underneath of:
  • Spree River
Coordinates: 52° 29' 53.92" N    13° 22' 21.83" E
Coordinates: 52° 31' 44.73" N    13° 21' 58.46" E

Technical Information


tunnel length 3 415 m
number of tubes 4

Design Loads

design speed max. 120 km/h

Relevant Web Sites

Relevant Publications

There is no relevant literature listed in the database.

  • About this
    data sheet
  • Structure-ID
  • Date created
  • Last Update