• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Tonton-Nipah Bridge

No images are currently available for this data page. If you would like to help us illustrate this page, do not hesitate to send us your images!

General Information

Structural Type: Box girder bridge
Haunched girder bridge
Function / usage: Road bridge
Construction method: Balanced cantilever method
Completed in: 1997
Status: in use

Geographic Information & Related Structures

Location: Tonton, Riau Islands, Indonesia, Asia
Nipah Island, Riau Islands, Indonesia, Asia

Technical Information

Dimensions

main span 160 m
total length 420 m
clearance 18 m
deck deck width 18 m

Materials

deck prestressed concrete

Participants

Prestressing

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

Internal Information
Structure-ID: 20004149
Created: 05/07/2002
Last Updated: 22/07/2014