General Information
Name in local language: | 東京ゲートブリッジ (Tōkyō gēto burijji); 東京港臨海大橋 (Tōkyōwan rinkai ōhashi) |
---|---|
Other name(s): | Tokyo Bay Waterfront Gate Bridge |
Beginning of works: | 2003 |
Completion: | 12 February 2012 |
Status: | in use |
Project Type
Structure: |
main bridge: Cantilever truss bridge |
---|---|
Support conditions: |
for registered users |
Function / usage: |
Road bridge |
Material: |
Steel bridge Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
total length | 2 618 m | |
vertical navigation clearance | 54.6 m | |
main bridge | ||
---|---|---|
total length | 792 m | |
span lengths | 160 m - 440 m - 160 m | |
number of spans | 3 | |
total height | 87.8 m |
Materials
piers |
reinforced concrete
|
---|---|
girder |
steel
|
truss |
steel
|
Participants
Relevant Web Sites
Relevant Publications
- New Sights of Light-up in Tokyo I: Tokyo Gate Bridge. In: Journal of the Illuminating Engineering Institute of Japan, v. 98, n. 7 (July 2014), pp. 285-288. (2014):
- (2015): Newly Developed Bridge High-performance Steel and its Application to Tokyo Gate Bridge. Presented at: IABSE Conference: Elegance in structures, Nara, Japan, 13-15 May 2015, pp. 168-169.
- Tokyo triple. In: Bridge Design & Engineering, v. 16, n. 59 (2nd Quarter 2010), pp. 24-26. (2010):
- About this
data sheet - Structure-ID
20059116 - Published on:
14/11/2010 - Last updated on:
06/01/2022