0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Status: project phase

Project Type

Structure: Tunnel
Function / usage: Road tunnel
Construction method: Immersed tube method

Location

Location: , , ,

Technical Information

Dimensions

total length 3 800 m
length of immersed tube tunnel section 1 240 m

Cost

cost of construction Euro 322 800 000

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20016288
  • Published on:
    14/05/2005
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine