• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Theodor Heuss Bridge

General Information

Other name(s): Theodor-Heuss-Brücke
Beginning of works: 1883
Completion: 30 May 1885
Status: in use

Project Type

Location

Location: , ,
, ,
Crosses:
  • Rhine River
Coordinates: 50° 0' 24.23" N    8° 16' 37.16" E

Technical Information

Dimensions

width 1885: 13.80 m
1933: 18.80 m
span lengths 87.13 m - 98.96 m - 102.94 m - 98.96 m - 87.13 m

Materials

arches steel

Chronology

1933

Widening.

1945

Destroyed. Rebuilt in the form of 1933.

1992
- 1995

Partial reconstruction. The concrete deck slab is replaced by an orthotropic deck.

Participants

Design
Rehabilitation
Consulting engineers

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20008286
  • Date created
    16/02/2003
  • Last Update
    04/05/2016