• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Tensho Bridge

No images are currently available for this data page. If you would like to help us illustrate this page, do not hesitate to send us your images!

General Information

Other name(s): Takamatu Bridge
Beginning of works: 1999
End of works: 2000
Status: in use

Project Type

Structure: Arch bridge
Construction method: Cantilever construction using temporary cable-stays
Material: Prestressed concrete bridge

Geographic Information & Related Structures

Location: Hinokage, Miyazaki, Japan
Coordinates: 32° 39' 34.00" N    131° 23' 25.00" E

Technical Information

Dimensions

total length 463.2 m
arch span 260 m
roadway / carriageway width 6.25 m

Materials

deck prestressed concrete

Participants

Co-contractor

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20004197
  • Date created
    05/07/2002
  • Last Update
    22/07/2014