0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 13 March 1995
Completion: 25 May 1998
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel

Location

Location: , ,
, ,
Coordinates: 22° 24' 29.06" N    114° 3' 35.12" E
Coordinates: 22° 22' 31.71" N    114° 4' 1.70" E
Show coordinates on a map

Technical Information

Dimensions

width 17 m
total length 3 750 m
tunnel section area 117 m²

Quantities

concrete volume 260 000 m³
excavated material 15 000 000 t

Cost

cost of construction United States dollar 791 000 000

Materials

tunnel structure concrete

Relevant Web Sites

Relevant Publications

  • Plumbridge, Glen (2006): Tai Lam tunnel. In: The Arup Journal, v. 41, n. 3 ( 2006), pp. 23.
  • About this
    data sheet
  • Structure-ID
    20010248
  • Published on:
    07/09/2003
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine