• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Svinesund Bridge

Svinesund Bridge

General Information

Beginning of works: 2002
End of works: 2005
Status: in use

Project Type

Structure: Arch bridge
Function / usage: Road bridge
Construction method: Cantilever construction using temporary cable-stays
Material: Reinforced concrete bridge

Geographic Information & Related Structures

Location: Strömstad, Västra Götalands län, Sweden
Sponvika, Østfold, Norway
Next to: Svinesund Bridge (1946)

Technical Information

Dimensions

total length 704 m
arch rise 30 m
arch span 247 m
deck height above valley floor or water > 90 m
total width 28 m

Materials

arch reinforced concrete

Participants

Structural engineering
Construction engineers
Checking engineering
Contractor
Steel construction
Subcontractor
Stay cables
Stay cable steel supplier
Bearing installation
Construction supervision
Project management
Concrete repair
Inspection services

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20004797
  • Date created
    04/09/2002
  • Last Update
    29/07/2014