• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Surgut Bridge

No images are currently available for this data page. If you would like to help us illustrate this page, do not hesitate to send us your images!

General Information

Beginning of works: 1995
Completion: 2000
Status: in use

Project Type

Structure: Cable-stayed bridge with semi-fan system
Function / usage: Road bridge
Material: Steel bridge

Geographic Information & Related Structures

Location: Surgut, Khanty-Mansi / Yugra, Urals Federal District, Russia
Crosses:
  • Ob River

Technical Information

Dimensions

main span 408 m
total length 2 070 m
span lengths 148 m - 408 m - 11 x 132 m - 56 m
deck deck width 15.2 m
pylon pylon height 146 m

Materials

superstructure steel
pylon steel
piers reinforced concrete

Chronology

October 1995

Pile installation begins

December 1998

Assembly of superstructure begins

1 July 1999

Superstructure for side span an part of main span completed on falsework.

June 2000

Cable-stayed portion complete.

Participants

Structural engineering
Main contractor
Stay cable steel supplier

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20001311
  • Date created
    11/02/2001
  • Last Update
    29/07/2014