• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Seventh Ahvaz Bridge

No images are currently available for this data page. If you would like to help us illustrate this page, do not hesitate to send us your images!

General Information

Structural Type: Haunched girder bridge
Box girder bridge
Function / usage: Road bridge
Construction method: Balanced cantilever method
Completed in: 1999
Status: in use

Geographic Information & Related Structures

Location: Ahvaz, Khuzestan, Iran, Asia
Crosses
  • Karoon River
Coordinates: 31° 20' 6.23" N    48° 41' 15.07" E

Technical Information

Dimensions

span lengths 30 m - 75 m - 2 x 140 m - 75 m - 30 m

Materials

deck prestressed concrete

Participants

Design

Relevant Web Sites

Relevant Publications

There is no relevant literature listed in the database.

Internal Information
Structure-ID: s0033080
Created: 05/11/2007
Last Updated: 24/07/2014