• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Setoko-Rempang Bridge

No images are currently available for this data page. If you would like to help us illustrate this page, do not hesitate to send us your images!

General Information

Project Type

Structure: Haunched girder bridge
Box girder bridge
Function / usage: Road bridge
Construction method: Balanced cantilever method
Material: Prestressed concrete bridge

Geographic Information & Related Structures

Location: Setoko Island, Riau Islands, Indonesia
Rempang Island, Riau Islands, Indonesia

Technical Information

Dimensions

main span 145 m
total length 365 m
clearance 15 m
deck deck width 18 m

Materials

deck prestressed concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

There is no relevant literature listed in the database.

  • About this
    data sheet
  • Structure-ID
    20008075
  • Date created
    10/02/2003
  • Last Update
    22/07/2014