• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Setoko-Nipah Bridge

No images are currently available for this data page. If you would like to help us illustrate this page, do not hesitate to send us your images!

General Information

Project Type

Structure: Box girder bridge
Function / usage: Road bridge
Construction method: Segmental construction
Material: Prestressed concrete bridge

Geographic Information & Related Structures

Location: Nipah Island, Riau Islands, Indonesia
Setoko Island, Riau Islands, Indonesia

Technical Information


main span 45 m
total length 270 m
clearance 15 m
deck deck width 18 m


deck precast prestressed concrete


Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

There is no relevant literature listed in the database.

  • About this
    data sheet
  • Structure-ID
  • Date created
  • Last Update