0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: August 1975
Completion: 1 July 1980
Status: in use

Project Type

Structure: Haunched girder bridge
Support conditions:
Function / usage: Road bridge
Material: Prestressed concrete bridge
Structurae Plus/Pro - Subscribe Now!
Construction method: main bridge:
Balanced cantilever method

Location

Location: , , ,
Crosses:
  • Rhine River
Supports:
  • Bundesstrasse B33
Coordinates: 47° 40' 13.02" N    9° 9' 46.74" E
Show coordinates on a map

Technical Information

Dimensions

main span 134.2 m
main bridge
total length 304.9 m
span lengths 85.35 m - 134.20 m - 85.35 m
number of spans 3
deck girder depth 3.5 - 8.0 m

Cost

cost of construction German Mark 16 400 000

Materials

superstructure prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20011411
  • Published on:
    04/01/2004
  • Last updated on:
    22/07/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine