0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1995
Completion: 1997
Status: in use

Project Type

Structure: Box girder bridge
Function / usage: Motorway bridge / freeway bridge
Material: Prestressed concrete bridge
Construction method: Incremental launching

Location

Location: , , ,
Carries:
  • Autoroute A16 [France]
Crosses:
  • Scardon River
Part of:
Coordinates: 50° 7' 24" N    1° 51' 33" E
Show coordinates on a map

Technical Information

Dimensions

total length 1 022 m
span lengths 32.20 m - 19 x 50.40 m - 32.20 m
number of spans 21
pier height max. 30 m
deck deck depth 3.50 m
deck width 19.20 m

Materials

superstructure prestressed concrete

Participants

Owner
Client
Design
Architecture
Structural engineering
Consulting engineers
Main contractor
Subcontractor
Foundations
Prestressing
(role unknown)

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    20003247
  • Published on:
    15/05/2002
  • Last updated on:
    07/12/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine