Rippachtal Junction Bridge No. 3/08

General Information

Official designation: BW 03/08
Beginning of works: 1996
Completion: 1997
Duration of works: 20 months
Status: in use

Project Type

Location

Location: , , , ,
Carries:
  • Autobahn A38
Crosses:
  • Autobahn A9
Part of:

Technical Information

Dimensions

total length 81.00 m
span lengths 18.0 m - 2 x 22.5 m - 18.0 m
clearance 4.80 m
bridge surface 4 131 m²
deck deck depth 1.10 m
deck width 51.0 m

Quantities

concrete volume 5 720 m³
reinforcing steel 512 t

Cost

cost of construction German Mark 6 500 000
cost of construction per m2 German Mark 1 577

Materials

deck slab reinforced concrete
girders precast reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20020175
  • Date created
    21/03/2006
  • Last Update
    05/02/2016