• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Reichenbichlbrücke

No images are currently available for this data page. If you would like to help us illustrate this page, do not hesitate to send us your images!

General Information

Beginning of works: 1994
Completion: 1996

Project Type

Structure: Girder bridge
Function / usage: Motorway bridge / freeway bridge
Material: Steel-reinforced concrete composite bridge

Geographic Information & Related Structures

Location: Tyrol, Austria

Technical Information

Dimensions

total length 450.85 m
span lengths 23.30 m + 2 x 30.00 m + 24.15 m / 23.30 m + 7 x 30.00 m + 23.30 m
deck deck depth 1.80 m
deck width 2 x 10.90 m
deck slab thickness 22 - 32 cm

Materials

deck slab reinforced concrete
girders steel

Participants

Structural engineering
Checking engineering
Co-contractor

Relevant Web Sites

Relevant Publications

There is no relevant literature listed in the database.

  • About this
    data sheet
  • Structure-ID
    20005387
  • Date created
    23/09/2002
  • Last Update
    22/07/2014