• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Puente General Artigas

No images are currently available for this data page. If you would like to help us illustrate this page, do not hesitate to send us your images!

General Information

Beginning of works: 1970
Completion: 1975

Project Type

Structure: Box girder bridge
Haunched girder bridge
Function / usage: Road bridge
Construction method: Balanced cantilever method
Material: Prestressed concrete bridge

Geographic Information & Related Structures

Location: Colón, Entre Ríos, Argentina
Paysandú, Uruguay
Crosses:
  • Uruguay River

Technical Information

Dimensions

total length 2 350.44 m
clearance 34 m
span lengths of main bridge 97 m - 140 m - 97 m
main bridge
length 334 m

Materials

superstructure prestressed concrete

Chronology

10 December 1975

Inauguration by the President of Argentina, Isabel Perón.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20004686
  • Date created
    27/08/2002
  • Last Update
    29/07/2014