• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Pleisse Viaduct

Pleisse Viaduct (Crimmitschau, 1997)

General Information

Structural Type: Box girder bridge
Function / usage: Motorway bridge / freeway bridge
Other name(s): Pleißetalbrücke
Official designation: BW 122
Built: 1995 - 1997
Duration of works: 27 months
Status: in use

Geographic Information & Related Structures

Location: Crimmitschau, Zwickau (Kreis), Saxony, Germany, Europe
Carries
  • Autobahn A4
Crosses
  • Pleisse River
Part of:

Technical Information

Dimensions

main span 45.50 m
width 36 m
total length 550 m
span lengths 35 m - 9 x 45.5 m - 2 x 37 m - 31 m
bridge surface 19 800 m²
height above valley floor or water 23 m
deck deck depth 3 m

Quantities

concrete volume 15 400 m³

Cost

cost of construction German Mark 38 000 000
cost of construction per m2 German Mark 1847

Materials

deck prestressed concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

Internal Information
Structure-ID: s0009924
Created: 08/08/2003
Last Updated: 29/07/2014