• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Pleisse Viaduct

Pleisse Viaduct (Crimmitschau, 1997)

General Information

Other name(s): Pleißetalbrücke
Official designation: BW 122
Beginning of works: 1995
End of works: 1997
Duration of works: 27 months
Status: in use

Project Type

Structure: Box girder bridge
Function / usage: Motorway bridge / freeway bridge
Material: Prestressed concrete bridge

Geographic Information & Related Structures

Location: Crimmitschau, Zwickau (Kreis), Saxony, Germany
Carries:
  • Autobahn A4
Crosses:
  • Pleisse River
Part of:

Technical Information

Dimensions

main span 45.50 m
width 36 m
total length 550 m
span lengths 35 m - 9 x 45.5 m - 2 x 37 m - 31 m
bridge surface 19 800 m²
height above valley floor or water 23 m
deck deck depth 3 m

Quantities

concrete volume 15 400 m³

Cost

cost of construction German Mark 38 000 000
cost of construction per m2 German Mark 1847

Materials

deck prestressed concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20009924
  • Date created
    08/08/2003
  • Last Update
    29/07/2014