General Information

Beginning of works: January 2005
Completion: March 2007
Status: in use

Project Type

Location

Location: , , ,
, , ,
Crosses:
  • Otay River
Coordinates: 32° 35' 22.95" N    116° 57' 58.16" W
Show coordinates on a map

Technical Information

Dimensions

total length 1 012 m
main spans 12 x 90 m
width of precast segments 10.85 m
total width 23.1 m
deck deck depth 3 - 5 m
piers height 55 m

Materials

deck precast prestressed concrete
piers reinforced concrete
piles reinforced concrete
abutments reinforced concrete
pile caps reinforced concrete

Chronology

August 2003

Design begins.

January 2005

Construction begins

March 2007

Bridge structure completed.

Notes

This is a concrete precast segmental bridge. The segments were cast in a casting yard eighty miles from the site, and individually transported to the site for erection. The deck is supported on cast-in-place concrete columns, and the foundation consists of cast-in-drilled-hole concrete piles. The segments were erecten in balanced cantilever, and an overhead gantry was used to erect the segments.

The superstructure consists of two variable depth box girders placed side-by-side. The bridge was built in a high seismic zone, and is designed to resist a peak ground acceleration of 0.4g. The bridge is part of the South Bay Expressway, and was built under a design-build contract.

A total of 640 prefabricated deck elements were used.

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20028247
  • Published on:
    01/06/2007
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine