• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Opole Bridge

No images are currently available for this data page. If you would like to help us illustrate this page, do not hesitate to send us your images!

General Information

Beginning of works: 1997
Completion: 1999
Status: in use

Project Type

Structure: Haunched girder bridge
Box girder bridge
Function / usage: Road bridge
Construction method: Balanced cantilever method
Material: Prestressed concrete bridge

Geographic Information & Related Structures

Location: Opole, Opole Voivodeship, Poland
  • Oder/Odra River

Technical Information


main span 100 m
total length 385 m
span lengths 45 m - 55 m - 100 m - 55 m - 45 m - 45 m - 40 m
deck deck depth 3.25 - 5.80 m
deck width 12.95 m


superstructure prestressed concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

There is no relevant literature listed in the database.

  • About this
    data sheet
  • Structure-ID
  • Date created
  • Last Update