Name in local language: Нерӯгоҳи обии Норак (Nerūgohi obii Norak)
Beginning of works: 1961
Completion: 1980
Status: in use

Project Type

Structure: Earthfill dam
Function / usage: Hydroelectric dam / plant

Location

Location:
Impounds:
  • Vakhsh [Surkhob]
Coordinates: 38° 22' 18.12" N    69° 20' 53.16" E
Show coordinates on a map

Technical Information

Dimensions

height 300 m
crest length 704 m
base thickness 1 108 m
dam volume 58 000 000 m³

Excerpt from Wikipedia

The Nurek Dam (Tajik: Нерӯгоҳи обии Норак, Nerūgohi obii Norak, Tajik for Nurek Hydro-electric Station) is an earth-fill embankment dam on the Vakhsh River in Tajikistan. Its primary purpose is hydroelectric power generation and its power station has an installed capacity of 3,015 MW. Construction of the dam began in 1961 and the power station's first generator was commissioned in 1972. The last generator was commissioned in 1979 and the entire project was completed in 1980 when Tajikistan was still a republic within the Soviet Union, becoming the tallest dam in the world at the time. At 300 m (984 ft), it is currently the second tallest man-made dam in the world, after being surpassed by Jinping-I Dam in 2013. The Rogun Dam, also along the Vakhsh in Tajikistan, may exceed it in size when completed.

Construction

The Nurek Dam was constructed by the Soviet Union between the years 1961 and 1980. It is uniquely constructed, with a central core of cement forming an impermeable barrier within a 300 m (980 ft)-high rock and earth fill construction. The volume of the mound is 54 million m³. The dam includes nine hydroelectric generating units, the first commissioned in 1972 and the last in 1979. An estimated 5,000 people were resettled from the dam's flooding area.

The dam is located in a deep gorge along the Vakhsh River in western Tajikistan, about 75 km (47 mi) east of the nation's capital of Dushanbe. A town near the dam, also called Nurek, houses engineers and other workers employed at the dam's power plant.

Electricity generation

A total of nine Francis turbine-generators are installed in the Nurek Dam's power station. Originally having a generating capacity of 300 MW each (2,700 MW total), they were redesigned and retrofitted between 1984 and 1988 so now have a capacity of 335 MW each (3,015 MW total). As of 1994, this formed most of the nation's 4.0 gigawatt hydroelectric generating capacity, which was adequate to meet 98% of the nation's electricity needs.

Reservoir

The reservoir formed by the Nurek Dam, known simply as Nurek, is the largest reservoir in Tajikistan with a capacity of 10.5 km³. The reservoir is over 70 km (40 mi) in length and has a surface area of 98 km² (38 sq mi). The reservoir drives the hydroelectric plant located within the dam. Stored water is also used for irrigation of agricultural land. Irrigation water is transported 14 kilometers through the Dangara irrigation tunnel and is used to irrigate about 700 km² (300 sq mi) of farmland. It is suspected that the reservoir may have caused induced seismicity when being impounded.

Text imported from Wikipedia article "Nurek Dam" and modified on 23 July 2019 under the CC-BY-SA 3.0 license.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20021055
  • Published on: