• de
  • en
  • fr
  • International Database for Civil and Structural Engineering
Advertising

New Sava Railroad Bridge

General Information

Beginning of works: 1976
Completion: 1979
Status: in use

Project Type

Location

Location: Belgrade, Serbia
Crosses:
  • Sava River
Coordinates: 44° 47' 59.62" N    20° 26' 10.36" E

Technical Information

Dimensions

total length 1 928 m
span lengths 52.7 m - 85.0 m - 50.0 m - 254 m - 50.0 m - 64.2 m
deck deck depth 4.50 m
pylon pylon height 57.00 m
main bridge
length 557.94 m

Materials

superstructure steel
cables steel
pylons steel

Notes

First cable-stayed bridge built solely for railway traffic.

Participants

Design
General contractor
Steel construction
Subcontractor
Stay cables
Steel supplier

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20003756
  • Date created
    20/06/2002
  • Last Update
    05/02/2016