General Information

Beginning of works: 2001
Completion: 20 July 2003
Status: in use

Project Type

Location

Location: , ,
Coordinates: 26° 11' 48.84" S    28° 2' 3.01" E
Show coordinates on a map

Technical Information

Dimensions

main span 176 m
total length 284 m
pylons pylon height 27 m / 43 m

Materials

pylon concrete-filled steel tubes
deck composite steel-reinforced concrete

Chronology

12 June 2001

Design begins.

12 September 2001

Construction begins.

20 July 2003

The bridge is opened by Nelson Mandela himself.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20004918
  • Published on:
    08/09/2002
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine