0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Viaduc de Miribel-Jonage
Beginning of works: 2002
Completion: 2003
Status: in use

Project Type

Structure: Girder bridge
Function / usage: Motorway bridge / freeway bridge
Material: Prestressed concrete bridge
Construction method: Incremental launching

Location

Location: , , ,
, , ,
Crosses:
  • Jonage Canal
Carries:
  • Autoroute A432
Crosses:
  • Miribel Canal
Part of:
Next to: Viaduc de Miribel-Jonage (1991)
Coordinates: 45° 48' 30.83" N    5° 3' 51.05" E
Show coordinates on a map

Technical Information

Dimensions

total length 530 m
span lengths 46.80 m - 4 x 50.440 m - 43.368 m - 43.247 m - 42.700 m - 47.643 m - 53.236 m - 46.800 m
number of spans 11
web thickness 0.400 m
deck deck depth 3.200 m
deck width 12.450 m

Cost

construction cost (without tax) Euro 9 000 000

Materials

deck prestressed concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20007878
  • Published on:
    17/01/2003
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine