• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Mashuihe River Viaduct

No images are currently available for this data page. If you would like to help us illustrate this page, do not hesitate to send us your images!

General Information

Structural Type: Girder bridge
Function / usage: Road bridge
Construction method: Balanced cantilever method
Completed in: 2008
Status: in use

Geographic Information & Related Structures

Location: Hubei, China, Asia

Technical Information

Dimensions

main span 200 m
height above valley floor or water 219 m

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

Relevant Publications

There is no relevant literature listed in the database.

Internal Information
Structure-ID: s0052338
Created: 24/01/2010
Last Updated: 24/07/2014