• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Lupu Bridge

General Information

Beginning of works: October 2000
Completion: 28 June 2003
Status: in use

Project Type

Location

Location: ,
Crosses:
  • Huangpu River
Coordinates: 31° 11' 28.00" N    121° 28' 35.00" E

Technical Information

Dimensions

width 28.7 m
height 100 m
total length 3 900 m
arch span 550 m

Cost

cost of construction Renminbi Yuan 2 500 000 000

Materials

arch steel

Chronology

7 October 2002

The arch is joined.

28 June 2003

Opened to traffic.

2008

Outstanding Structure Award 2008 (IABSE)

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20009662
  • Date created
    24/07/2003
  • Last Update
    05/02/2016