• de
  • en
  • fr
  • International Database for Civil and Structural Engineering
Advertising

Kushimoto Bridge

General Information

Completion: 1999
Status: in use

Project Type

Structure: Two-hinged arch bridge
Function / usage: Road bridge
Construction method: Cantilever construction using temporary cable-stays
Material: Steel bridge

Location

Location: ,

Technical Information

Dimensions

total length 290 m

Materials

arch steel

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

There is no relevant literature listed in the database.

  • About this
    data sheet
  • Structure-ID
    20005420
  • Date created
    23/09/2002
  • Last Update
    05/02/2016