0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2008
Completion: 2015
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel
Construction method: Wall-cover construction method
Cut-and-cover method

Location

Location: , , ,
Address: Hofgartenstraße / Elberfelder Straße / Berliner Allee / Immermannstraße
Replaces: Jan-Wellem-Platz Elevated Road (1962)
Connects to: Kö-Bogen (2013)
Coordinates: 51° 13' 44.53" N    6° 46' 52.14" E
Coordinates: 51° 13' 35.06" N    6° 46' 41.17" E
Coordinates: 51° 13' 28.68" N    6° 46' 58.52" E
Coordinates: 51° 13' 31.21" N    6° 47' 3.74" E
Show coordinates on a map

Technical Information

There currently is no technical data available.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20037082
  • Published on:
    13/05/2008
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine