Completion: 1970
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Clyde River
Carries:
  • M 8 Motorway
Coordinates: 55° 51' 21.04" N    4° 16' 12.65" W

Technical Information

Dimensions

span lengths 62.5 m - 143.3 m - 62.5 m

Materials

superstructure prestressed concrete

Chronology

1999
- 2000

After discovering excessive deformations and problems with the substructure, the bridge undergoes a complete overhaul. The structure is changed from a monolithic pier connection to bearing supports, making it a simply supported bridge. Additional prestressing is introduced.