• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

King Carol I Bridge

No images are currently available for this data page. If you would like to help us illustrate this page, do not hesitate to send us your images!

General Information

Other name(s): Podul Regele Carol I.
Beginning of works: 1890
End of works: 1895

Project Type

Structure: Box girder bridge
Function / usage: Railroad (railway) bridge
Material: Steel bridge

Geographic Information & Related Structures

Location: Cernavoda, Constanţa, Romania
Fetesti, Ialomiţa, Romania
Crosses:
  • Danube
Next to: Cernavoda Bridge (1987)
Near: Bridge over the Borcea Branch (1895)

Technical Information

Dimensions

total length 1661.900 m
main spans 2 x 140.00 m - 190.00 m - 2 x 140.00 m

Materials

truss steel

Chronology

1965
- 1967

The bridge is restored and strengthened.

Participants

Design

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20003716
  • Date created
    20/06/2002
  • Last Update
    22/07/2014