• de
  • en
  • fr
  • International Database for Civil and Structural Engineering
Advertising

King Carol I Bridge

General Information

Other name(s): Podul Regele Carol I.
Beginning of works: 1890
Completion: 1895

Project Type

Structure: Box girder bridge
Function / usage: Railroad (railway) bridge
Material: Steel bridge

Location

Location: , ,
, ,
Crosses:
  • Danube
Next to: Cernavoda Bridge (1987)
Near: Bridge over the Borcea Branch (1895)

Technical Information

Dimensions

total length 1661.900 m
main spans 2 x 140.00 m - 190.00 m - 2 x 140.00 m

Materials

truss steel

Chronology

1965
- 1967

The bridge is restored and strengthened.

Participants

Design

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20003716
  • Date created
    20/06/2002
  • Last Update
    05/02/2016