Kampong Pandan Flyover

General Information

Completion: 2008
Status: in use

Project Type

Structure: Box girder bridge
Function / usage: Road bridge
Construction method: Balanced cantilever method
Material: Prestressed concrete bridge

Location

Location: , ,

Technical Information

Dimensions

total length 568 m
number of spans 12
deck girder depth 2.4 - 3.2 m
Section 1 total length 192.0 m
span lengths 40.0 m - 2 x 56.0 m - 40.0 m
Section 2 total length 240.0 m
span lengths 40.0 m - 2 x 56.0 m - 48.0 m - 40.0 m
Section 3 total length 136.0 m
span lengths 40.0 m - 56.0 m - 40.0 m

Materials

deck prestressed concrete