• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Kampong Pandan Flyover

No images are currently available for this data page. If you would like to help us illustrate this page, do not hesitate to send us your images!

General Information

Completion: 2008
Status: in use

Project Type

Structure: Box girder bridge
Function / usage: Road bridge
Construction method: Balanced cantilever method
Material: Prestressed concrete bridge

Geographic Information & Related Structures

Location: Kuala Lumpur, Kuala Lumpur, Malaysia

Technical Information

Dimensions

total length 568 m
number of spans 12
deck girder depth 2.4 - 3.2 m
Section 1 total length 192.0 m
span lengths 40.0 m - 2 x 56.0 m - 40.0 m
Section 2 total length 240.0 m
span lengths 40.0 m - 2 x 56.0 m - 48.0 m - 40.0 m
Section 3 total length 136.0 m
span lengths 40.0 m - 56.0 m - 40.0 m

Materials

deck prestressed concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20049503
  • Date created
    08/12/2009
  • Last Update
    24/07/2014